{"id":86,"date":"2020-01-22T10:07:42","date_gmt":"2020-01-22T07:07:42","guid":{"rendered":"http:\/\/beta-air.ru\/en\/?page_id=86"},"modified":"2020-04-29T23:09:49","modified_gmt":"2020-04-29T20:09:49","slug":"features","status":"publish","type":"page","link":"https:\/\/beta-air.ru\/en\/features\/","title":{"rendered":"Features"},"content":{"rendered":"<h2><strong>The Main Feature<\/strong><\/h2>\n<h3><strong>All test program sets and test unit adapters should operate equally<\/strong><\/h3>\n<ul>\n<li>On test stations with variety of configurations<\/li>\n<li>On test stations with various hardware<\/li>\n<li>On test stations manufactured in different years<\/li>\n<\/ul>\n<h3><strong>Advantages<\/strong>:<\/h3>\n<p>&#8212; Flexibility in operation and maintenance<\/p>\n<p>&#8212; Predictable costs for future upgrade<\/p>\n<p>&#8212; Early identification of hidden costs<\/p>\n<p>&#8212; Minimization of costs and time for spare parts procurement<\/p>\n<p>&#8212; High operational availability<\/p>\n<p>&nbsp;<\/p>\n<p>Expansion of capabilities at customer\u2019s site should be done without modification of test station.<\/p>\n<p>\u00a0 Only modular instruments can be installed that were not procured with initial delivery.<\/p>\n<p>&nbsp;<\/p>\n<h3><strong>\u00a0\u00a0\u00a0\u00a0\u00a0 Expansion can be done by:<\/strong><\/h3>\n<ul>\n<li>Upgrade of test program sets (TPS) or test unit adapters (TUA) (for new objects additionally to those delivered earlier)<\/li>\n<li>Delivery of new TPS\u2019s and TUA\u2019s for new types of units under test<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-158 size-full\" src=\"http:\/\/beta-air.ru\/en\/wp-content\/uploads\/sites\/2\/2020\/04\/en_map2.png\" alt=\"\" width=\"842\" height=\"595\" srcset=\"https:\/\/beta-air.ru\/en\/wp-content\/uploads\/sites\/2\/2020\/04\/en_map2.png 842w, https:\/\/beta-air.ru\/en\/wp-content\/uploads\/sites\/2\/2020\/04\/en_map2-300x212.png 300w, https:\/\/beta-air.ru\/en\/wp-content\/uploads\/sites\/2\/2020\/04\/en_map2-768x543.png 768w\" sizes=\"auto, (max-width: 842px) 100vw, 842px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Main Feature All test program sets and test unit adapters should operate equally On test stations with variety of configurations On test stations with various hardware On test stations manufactured in different years Advantages: &#8212; Flexibility in operation and maintenance &#8212; Predictable costs for future upgrade &#8212; Early identification of hidden costs &#8212; Minimization [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-features.php","meta":{"inline_featured_image":false,"footnotes":""},"class_list":["post-86","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/beta-air.ru\/en\/wp-json\/wp\/v2\/pages\/86","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/beta-air.ru\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/beta-air.ru\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/beta-air.ru\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/beta-air.ru\/en\/wp-json\/wp\/v2\/comments?post=86"}],"version-history":[{"count":10,"href":"https:\/\/beta-air.ru\/en\/wp-json\/wp\/v2\/pages\/86\/revisions"}],"predecessor-version":[{"id":159,"href":"https:\/\/beta-air.ru\/en\/wp-json\/wp\/v2\/pages\/86\/revisions\/159"}],"wp:attachment":[{"href":"https:\/\/beta-air.ru\/en\/wp-json\/wp\/v2\/media?parent=86"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}